Quick Donation
“He who sleeps on a full stomach whilst his neighbor goes hungry is not one of us.”
(Prophet Muhammad)
Full House with Baranda
£1500
Full House with Baranda & Kithen
£1800
Full House with Baranda, Toilet & Kitchen
£2000
DonateAny Amount
Others Ways You Can Help.
Fundraise For This AppealKey Figures
Built over 720 houses
In 2023, 72 Houses built
In 2024 our aim to build 200 houses
housing Project in Bangladesh
It is common knowledge that Bangladesh being a developing country that many thousands do not have adequate shelter and as a result they lose their lives due to very extreme weather such as heavy storms and flooding which is persistent. The houses that are made from clay cannot withstand heavy weather and are unable to keep rain water and cold out. Extreme weather can only be kept out with a solid house whereby a family can peacefully lay their heads in peace and not thinking the worse every night.
One permanent house contains two bedrooms, a front veranda, kitchen and a toilet. We use bricks for the 4 sided wall and tin roof. We have two different types of houses one which cost £1800 for full house (two beds, kitchen & front porch) and £2000 will include two beds, kitchen, toilet & front porch). We are working toward a better future for Bangladesh. We understand the importance of having a roof over peoples head in the harsh environment.We are striving to built and accommodate more than 1000 families by 2030. We are planning to reach vulnerable people in another district around Bangladesh.
Abdul Wadud Sreemangal, Moulvibazar
Due to a faulty electric cable our house caught fire and was completely destroyed. We became homeless for more than a year, living in different places. Alhamdulillah, at the end of 2020, G&Y built a house with a kitchen and toilet facilities. It is so beautiful that we are now living in safe accommodation.
Mushahid Ali Allwa, Moulvibazar
We couldn’t even dream of having a house of this kind, we couldn’t feed our family 3 meals per day, never mind build a house.
Please Note: The construction project can take up to 9-10 months to complete once the donation has been made. This is due to restrictions of some locations and also taking into account the weather and suitability of building in certain period of the year. Additionally, a due diligence check must also be carried out.